Construction power configurator

Offer for construction power with our construction power configurator

Submit your data conveniently online via our Construction power configurator. Fill out the form below and we will get back to you as soon as possible.

By the way: We respect the protection of your data. Your details will only be sent to us if you expressly decide to do so at the end of the configuration.

What is the construction site power connection needed for?*

When should the construction site power connection be available? (approximate period with date) **

** When scheduling, please allow at least two to three weeks’ notice for registration with the energy supplier

Type of connection?


energy supplier? (optional)


Power/connection value? (optional))

Desired max. power/connection value (if a transformer measurement is required) - 80A to ...


connection point (optional)


Site plans of the property or construction site plans


* Required fields
Search
Close this search box.

We are experts for welding technology, engineering, and pressure vessel inspection.

With passion. For you.